Perishables Warehouse Remedial Works
Crestmead, QLD
Industrial
Wetherill Park, NSW
Industrial
Industrial
Aliro
$1 million
Aliro’s tenant at their Newton Road facility in Wetherill Park was expanding to the point they required an awning extension to the rear of their site for additional storage. Engine Room ran the design team to maximise this awning from a fire engineering, planning, structural and trafficable perspective. The resulting design exceeded the initial requirements from the tenant but allowed Aliro to maximise the functionality of their site.
Throughout the construction period, the site would remain live and would only lend itself to staged delivery avoiding the frequent truck movements onsite, this would prove most difficult with the reinforcement of the existing slab but again, with precise coordination and programming, this would be managed closely with the tenant.
Live environment with a heavy vehicle presence
Awning Expansion of 1,800m2
Fire Engineering Upgrade
Slab and footing replacement
The Engine Room VM team are currently working remotely in an effort to support the safety and wellbeing of our staff and associated communities. Whilst our physical office is closed, we remain connected to our clients and project teams via virtual conferencing and are operating “business as usual”. We’re here to provide support during these uncertain times; please get in contact with our experienced team should you be seeking clarity on the implications of COVID-19 on your project.